A message from our LAPD Senior Lead Officer Matt Kirk

Brentwood has experienced a 25% decrease in part one crime this year compared to the same time in 2022. In every crime category, we had a decrease in crime with 11% being the lowest decrease in crime. For Brentwood to continue with these low crime rates, we must all make efforts to make the . . . → Read More: A message from our LAPD Senior Lead Officer Matt Kirk

October 2023 Transportation Update

SBRA is monitoring projects impacting traffic in South Brentwood including:

Sepulveda Transit Corridor – Six alternatives for heavy rail (subway) or monorail through the Sepulveda pass from Van Nuys to the Expo (E) Line are under consideration. Target completion is 2033 – 2035 with a future Phase 2 to LAX by 2054-55. Most alternatives . . . → Read More: October 2023 Transportation Update

South Brentwood Residents Association 47th Annual General Meeting on Thursday, October 19, 2023 at 6:30 p.m.

Confirmed Speakers

Hydee Feldstein Soto, Los Angeles City Attorney Lindsey Horvath, L.A. County Supervisor, 3rd District Matthew Kirk, Senior Lead Officer, West Los Angeles LAPD Bryan Kirkness, Chief Inspector, L.A. Housing Department, Code Enforcement, discussing Earthquake codes Traci Park’s Team, CD11 Councilwoman, District 11, City of . . . → Read More: South Brentwood Residents Association 47th Annual General Meeting on Thursday, October 19, 2023 at 6:30 p.m.

Wilshire Purple Line Construction (Line D)

For the latest information on Purple Line Construction and to sign up for updates, please visit this page. https://www.metro.net/projects/westside/

Wilshire/La Brea, Wilshire/Fairfax, and Wilshire/La Cienega are slated to open in 2024.Wilshire/Rodeo and Century City/Constellation are slated to open in 2025.Wilshire/Westwood and Wilshire/VA Hospital are slated to open in 2027.

SBRA . . . → Read More: Wilshire Purple Line Construction (Line D)

Sepulveda Transit Corridor

Los Angeles Metro is currently reviewing six alternatives for transit through the Sepulveda pass. The route would initially go from the Orange Line in Van Nuys to the Expo Line (now called the E line) and the target completion is 2033 – 2035. Eventually Phase 2 of the line would reach LAX by 2054-55.

. . . → Read More: Sepulveda Transit Corridor

STAP (Sidewalk and Transit Amenities Program)

The Bureau of Street Services plans to replace the existing bus shelters on Wilshire Blvd. with new ones that will include digital rotating ads to replace the static ads currently on the shelters. These are scheduled to be installed over a 4 to 6 year period beginning in 2024.

SBRA . . . → Read More: STAP (Sidewalk and Transit Amenities Program)

VA Greater Los Angeles Healthcare System (VAGLAHS)4th Virtual Master Plan 2022 Townhall Thursday, October 28, 2021

VAGLAHS Hosts Master Plan 2022-2027Virtual TownhallThank you for your interest in the Master Plan 2022, and a special thank you to those who took the time to attend the Master Plan 2022 Townhall meetings on August 19, September 9, and September 30. Meeting slide decks and video recordings can be accessed at any time . . . → Read More: VA Greater Los Angeles Healthcare System (VAGLAHS)4th Virtual Master Plan 2022 Townhall Thursday, October 28, 2021